You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Sign In
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
WaterConnect
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Home
Currently selected
Water Management
Legislation and Agreements
Licences and Permits
Trading and Markets
Urban Water
Water Planning
Water Security
Flood Awareness
Flood Awareness Information
Flood Awareness Map
Flood Studies and Reports
Water Resources
Groundwater
Surface Water
River Murray
Riverbank collapse
Levee profile mapping
River Murray Infrastructure Data
River Murray Inundation Mapping
Science and Research
Monitoring
Research
Salinity and Water Quality
Science
Industry and Mining
Coal Seam Gas and Coal Mining
FLOWS Initiative
Data Systems
Groundwater Data
Infrastructure Data
Patawalonga Lake System
Spatial Data
Surface Water Data
Water Allocation Data
DifferenceResults_Jan2014To4Apr2014_SedimentBasinA
Analysis
Home
Sediment Accumulation Monitoring System (SAMS)
Analysis
Home
»
Sediment Accumulation Monitoring System (SAMS)
»
Analysis
Contact Us
About
Disclaimer
Privacy
Accessibility
Site Map
Home
Real-Time-Flow
Monitoring Plan
Monitoring Data
Analysis
Remediation Actions
Forecasting
Action Plan
Chemical
Hydrographic
Cut Fill Results Baseline To 4 Apr 2014 Sediment BasinA
Cut Fill Results Jan 2014 To 4 Apr 2014 Sediment BasinA
Difference Results Baseline To 4 Apr 2014 Sediment Basin A
Difference Results Jan 2014 To 4 Apr 2014 Sediment BasinA
Generated 4 April 2014 Surface Sediment Basin A
Patawalonga Survey 4th April 2014 to Baseline Cut Fill Summary
Patawalonga Survey 4th April 2014 to Jan 2014 Cut Fill Summary
Basin A Depth Difference - Jan 2014 - Apr 2014
Cut and Fill Jan 2014 vs Baseline
Pat Cut Fill Summary
Dredge Plan Polygon
Basin A Depth Difference - Jan 2014 - Apr 2014
Average Baseline Depth
SMP stage 3 sediment level
Cut and Fill Results - Jan 2014 - Apr 2014
Cut and Fill Summary Jan 2014 vs Baseline
Dredge Plan Polygon - Download
Cut and Fill Summary - Jan 2014 - Apr 2014
Location of Captured Data Points
Jan 2012 Surface TIN
Jan 2012 Surface TIN - Download
Sediment Depth with Contours Jan 2014 vs Baseline
Sediment Depth Jan 2014 vs Baseline
Sediment Depth Jan 2014 vs Baseline