You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Sign In
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
WaterConnect
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Home
Currently selected
Water Management
Legislation and Agreements
Licences and Permits
Trading and Markets
Urban Water
Water Planning
Water Security
Flood Awareness
Flood Awareness Information
Flood Awareness Map
Flood Studies and Reports
Water Resources
Groundwater
Surface Water
River Murray
Riverbank collapse
Levee profile mapping
River Murray Infrastructure Data
River Murray Inundation Mapping
Science and Research
Monitoring
Research
Salinity and Water Quality
Science
Industry and Mining
Coal Seam Gas and Coal Mining
FLOWS Initiative
Data Systems
Groundwater Data
Infrastructure Data
Patawalonga Lake System
Spatial Data
Surface Water Data
Water Allocation Data
Sediment_Management_Internal_Correspondance
Remediation Actions
Home
Sediment Accumulation Monitoring System (SAMS)
Remediation Actions
Home
»
Sediment Accumulation Monitoring System (SAMS)
»
Remediation Actions
Contact Us
About
Disclaimer
Privacy
Accessibility
Site Map
Home
Real-Time-Flow
Monitoring Plan
Monitoring Data
Analysis
Remediation Actions
Forecasting
Action Plan
Dredging 2014 RFP
Addendum No 1.0 DEWNR024491
Appendix 7 Report on Environmental Sampling and Analysis of Sediment Materials Patawalonga Basin May 2005 DEWNR024491
Appendix 8 Patawalonga Lakes System Sediment Management Sustainability Management Plan DEWNR024491
Appendix 9 Summary of Available Sediment Material Data DEWNR024491
DEWNR024491 Request for Proposal Sediment Management at the Patawalonga Lake System
Sediment Management Project - Development Application - Nov 2013
Excerpt PART E
Dredging Layout Proposal
Presentation - Enviro Pacific Stage 1 Sediment Removal
EPA Additional Information Request
EPA Development Application Response
Appendix 2 - Excerpt PART E of RfP
Appendix 3 Engineering Investigation Background 23 July 2013
Appendix 1 Patawalonga Lakes System Location of Works Plan DEWNR024491
Appendix 2 Patawalonga Lakes System Land Titles Plan DEWNR024491
Appendix 3 National Airports Safeguarding Framework DEWNR024491
Appendix 4 Engineering Investigation Background (modified) Report 23 July 2013 DEWNR024491
Appendix 5 Patawalonga Lakes System Sedimentation Survey Aurecon PL Australia 2 December 2009 DEWNR024491
Appendix 6 Revision Patawalonga Lakes System System Operation DEWNR July 2013 DEWNR024491
Assessment and Analysis
Dredging 2014
Long Term Management Options Engineering Investigation and Background Report
Long Term Management Options - Long Term Option Review
Presentation - Maratime Constructions - Risk Workshop
Noise and Odor Control Measures
Patawalonga Gate Modelling Report
Internal Correspondance - Sediment Management Project
Proposed KPI Framework Template (download)
Sediment Management Project Risk Register
West Torrens Council Development Application Response
Alternate Southern Access for Craneloading Pontoons
Waste Sediment Treatment EPA Application
Dredging 2008